Farmers Electric Distributed Generation Application
If you are installing solar or wind on your home or business, you are in the right place! Please fill in all the fields below to submit your application. (DG = Distributed Generation , this is a term for solar and wind generators among other generation technologies)
Email
example@example.com
System Installation
*
We are installing a new DG system
We are adding DG to an account with existing DG
Check All That Apply To Your DRG Installation: (If none apply to your install, contact our Customer Service Department at 903-455-1715)
*
Solar
Wind
Battery
System size (Total DG output in kWAC)
*
Member Name (This is the name that appears on the account and must be on page 1 and 19 of the Interconnection Agreement)
*
First Name
Last Name
Service Address (This address is to be listed on page 17 and 19 of the Interconnection Agreement)
*
Street Address
Street Address Line 2
City
State / Province
Postal / Zip Code
Member Account Number (This number should be on page 19 of the Interconnection Agreement)
*
Member Billing Meter Number
Bold six digit number on the meter
Member Email
*
example@example.com
Installer Email (who should we correspond with about this project)
*
example@example.com
Additional Email
example@example.com
Additional Email
example@example.com
Upload Interconnection Agreement
*
Browse Files
Drag and drop files here
Choose a file
Cancel
of
Upload Electrical Drawing
*
Browse Files
Drag and drop files here
Choose a file
Cancel
of
Upload Layout Drawing
Browse Files
Drag and drop files here
Choose a file
Cancel
of
B
efore you submit, please check the quality assurance questions below.
Did you include the DG output meter in the drawing?
*
Yes
Did you ensure proper wiring of the DG Output Meter?
*
Yes
The Member/Homeowner signed pages 19 and 28 of the Interconnection Agreement.
*
Yes
The appropriate account # is listed on page 19 of the Interconnection Agreement.
*
Yes
The appropriate equipment information is listed on page 21 and 22 of the Interconnection Agreement.
*
Yes
I understand that if there are issues with my documentation I will be contacted via email about corrections needed. If I am not contacted within 48 hours the project is approved for installation. No further communication is needed until it is time to submit the request for inspection.
*
Yes
Projects Notes:
Submit
Should be Empty: